Hazardous Area Design (HAD) is Ideal for EPC design phases, brownfield upgrades and compliance remediation.
Once the hazardous zones are defined the design must translate those zones into a buildable solution. We help asset owners and EPCs select compliant Ex equipment and protection techniques, define installation requirements, and produce the documentation needed for construction, commissioning, and ongoing inspection/maintenance.
Key outcomes
- Correct Ex equipment for the zone (EPL, gas group, temperature class, dust/IP requirements) — without over-specifying
- Installation detail that stands up to commissioning pressure (glands, sealing, segregation, earthing/bonding, mechanical protection)
- Documentation that supports inspection, maintenance, and future upgrades
What we do (scope inclusions)
- Review HAC outputs (or validate existing zones) and confirm design basis
- Develop an Ex Equipment Selection Schedule (EPL/protection technique, gas group, temp class, certificates, ‘X’ conditions)
- Engineering support for protection techniques (e.g., Ex d, Ex e, Ex i, Ex p, Ex n, Ex t) and IS loop design where required
- Define installation requirements: cable/gland selection, sealing, segregation, ingress protection, earthing/bonding, labeling
- Vendor package review (motors, lighting, instruments, skids) to confirm certification and suitability
- Audit/verification readiness planning: inspection checklists, ITP/ITC, evidence requirements
Typical deliverables
- HAD Philosophy / Basis of Design (assumptions + verification approach)
- Ex equipment register + selection schedule (certificates + conditions of use)
- Installation requirements/spec for contractors (glands, sealing, conduits, segregation, terminations)
- Drawing markups/updates (as required) + construction notes
- Hazardous-area ITP/ITCs and commissioning checklists
- Handover dossier structure to support ongoing inspection and maintenance
{/col}{col4}
|
Call our Team about 1300 15 66 85 |
Other HADC Services
Hazardous Area Classification
{/col}{/row}
Hazardous Area Classification FAQs
{toggle2 title=”Can you work alongside our EPC/design house?“}
Can you work alongside our EPC/design house?
Yes, we slot in as Ex SMEs and provide design assurance through targeted reviews (e.g., 30/60/90% design), helping keep the project compliant without slowing delivery.
{/toggle}
{toggle2 title=”Can you review vendor skid packages?“}
Can you review vendor skid packages?
Yes, before installation we check Ex certification, EPL/gas group/temp class, any “X” conditions, and practical items like cable entries, glands, sealing and documentation completeness.
{/toggle}
{toggle2 title=”Do you provide intrinsic safety loop calculations?“}
Do you provide intrinsic safety loop calculations?
Yes, we develop or verify IS loop calculations (barrier/isolator selection, device parameters, cable limits) and package it into documentation that’s easy to maintain through future changes.
{/toggle}
{toggle2 title=”Can you help make us “audit ready” before commissioning?“}
Can you help make us “audit ready” before commissioning?
Yes, we run an audit readiness check: document pack review + targeted walkdown + a prioritised punch list. This reduces late findings and protects commissioning dates.
{/toggle}
Why RelyOn?
• Led by industry-recognised HACD engineers
• Independent, defensible engineering advice
• Deep experience across renewables, BESS, hydrogen & industrial assets
• Integrated with broader electrical safety & compliance services