Client Background and Problem Statement

Transgrid, a leading energy provider managing a vast network of substations, sought assistance in addressing arc flash hazards present in their low voltage distribution boards connected to the step-down transformers.
Recognising that many of their substations carried an elevated risk due to high incident energy (I.E) levels, Transgrid engaged RelyOn Australia to conduct a preliminary arc flash risk assessment to identify the highest risk substations, and develop comprehensive risk mitigation plans.
Given the scale of Transgrid’s operations and the inherent safety risks of arc flash incidents, effective and practical risk mitigation strategies were essential.

Scope of Work

The project aimed to evaluate and manage arc flash risks across Transgrid’s substations using the IEE1584 standard for arc flash calculation. RelyOn Australia undertook the following tasks:

  1. Arc Flash Calculations: Conducted incident energy calculations based on IEEE 1584 to assess potential arc flash hazards across different substations.
  2. Risk Assessment by Substation: Identified substations with the highest I.E. values to prioritise mitigation measures.
  3. Risk Mitigation Recommendations: Provided tailored mitigation strategies, including engineering controls, procedural controls, and recommended arc-rated Personal Protective Equipment (PPE) for different risk levels.
  4. Implementation Guidance: Suggested practical procedures for integrating these mitigation measures across substations, ensuring operational feasibility and safety compliance.

 

Key Deliveries

RelyOn Australia provided the following:

Results and Benefits

How We Can Help You