Arc Flash Risk Assessment for Transgrid Substations

{widearea-grey margintop=”0px” marginbottom=”10px” paddingtop=”0px” paddingbottom=”0px” image=”” ratio=”0.2″} {/widearea} Arc Flash Risk Assessment for Transgrid Substations {row}{col8} Client Background and Problem Statement Transgrid, a leading energy provider managing a vast network of substations, sought assistance in addressing arc flash hazards present in their low voltage distribution boards connected to the step-down transformers.Recognising that many of their […]

Cm3

  Background Cm3 is Australia’s leading online Contractor OHS/WHS Prequalification system. Cm3 addresses the need for both contractors and the organisations they conduct work for to demonstrate contractor health and safety management capabilities, along with providing assistance for organisations to better manage their contractors around health and safety requirements.   Our role Thomson Bridge was […]

ATCO Karratha Power Station (WA)

Background ATCO is a world-class developer, construction manager, owner and operator of technologically advanced and environmentally progressive independent power generation plants. ATCO Power Australia has ownership in, and operates, three power generation facilities in Australia. The ATCO Karratha Power Station was commissioned in 2010 and is the most efficient and environmentally friendly power generation facility […]

Tallawarra Power Station (NSW)

Background Tallawarra Power Station, owned by EnergyAustralia, is a state-of-the-art combined cycle, natural gas power station located on the shores of Lake Illawarra in New South Wales. Commencing operation in January 2009, it is one of Australia’s most environmentally efficient, large-scale gas-fired power stations. The station’s generation capacity is 435 MW – which is enough […]

AGL Nyngan Solar Plant (NSW)

Background AGL is delivering two large-scale solar photovoltaic (PV) power plants with a total capacity of 155 MW (AC) at Nyngan (102 MW) and Broken Hill (53 MW) in regional New South Wales. On an annual basis, the projects at Nyngan and Broken Hill will produce approximately 360,000 megawatt hours of electricity, which will be […]

Pacific Hydro Wind and Hydro sites (VIC + SA)

Background Pacific Hydro has a large number of operating assets and development projects in Australia across Victoria, South Australia, Western Australia and New South Wales. This includes six operating wind farms and three hydro facilities.   Our role Pacific Hydro seeks to implement a Lock Out Tag Out (LOTO) procedure as part of its maintenance […]

Cape Byron Power Cogeneration (NSW)

Background Cape Byron Power owns and operates two biomass fired power stations on the north coast of New South Wales. When constructed in 2008 these power stations cost in the region of $240M. These cogeneration sites are located within the New South Wales Sugar Mills Cooperative (NSWSMC) sugar mill sites called Condong and Broadwater. The […]